☀️ Solar Panel Calculator (India)

Calculate your rooftop solar system size, PM Surya Ghar subsidy, and payback — explained step by step.

🇮🇳 City-wise peak sun hours · PM Surya Ghar subsidy up to ₹78,000 · ₹/unit savings estimate

Your Details

Check your latest electricity bill.

0.80 is standard for India (heat, dust, inverter losses).

☀️

Enter your monthly electricity units and city to see your solar system size, PM Surya Ghar subsidy, and payback.

After calculating, you can download a CSV report and share the result.

📖 Definition

A Solar Panel Calculator for India estimates the rooftop solar system size (in kW) and panel count needed to meet a household's monthly electricity consumption. It uses city-wise peak sun hours (which range from 4.5 in Guwahati to 6.5 in Jodhpur [citation:4]), a real-world derate factor (0.80 for India's heat and dust), and the PM Surya Ghar: Muft Bijli Yojana subsidy structure (₹30,000/kW for first 2 kW, ₹18,000 for 3rd kW, max ₹78,000) [citation:2][citation:5]. It also estimates net cost, annual generation, and simple payback in years.

✅ Benefits

  • India-specific: city-wise peak sun hours from Jodhpur to Guwahati [citation:4].
  • PM Surya Ghar ready: subsidy calculated correctly with the 3 kW cap [citation:2][citation:12].
  • Payback estimate: see how many years to break even.
  • Transparent: every result comes with a full step-by-step calculation.
  • Downloadable: export a CSV report for vendor quotes.
  • Shareable: send via WhatsApp or copy the result.

📐 Formula

Let D = daily kWh need, H = peak sun hours, R = derate factor, P = panel wattage, and Sub = PM Surya Ghar subsidy.

Daily need = Monthly units ÷ 30

Daily per kW = H × R

System kW = Daily need ÷ (H × R)

Panels = ceil( (System kW × 1000) ÷ P )

Subsidy = min(System kW, 3) → ₹30,000/kW (first 2) + ₹18,000 (3rd)

Net cost = Gross cost − Subsidy

Payback = Net cost ÷ Annual savings

📝 Example

A home in Delhi uses 300 units/month, has 5.5 peak sun hours, uses 540 W panels, and 0.80 derate.

  • Daily need = 300 ÷ 30 = 10 kWh/day
  • Daily per kW = 5.5 × 0.80 = 4.4 kWh/kW
  • System size = 10 ÷ 4.4 = 2.27 kW
  • Panels = (2.27 × 1000) ÷ 540 = 4.2 → 5 panels
  • Subsidy = ₹60,000 (first 2 kW) + ₹18,000 × 0.27 ≈ ₹64,909
  • Net cost ≈ ₹1,24,850 − ₹64,909 = ₹59,941

🧮 Step-by-Step Calculation

Step 1: Daily need

300 ÷ 30 = 10 kWh/day

Step 2: Daily per kW

5.5 × 0.80 = 4.4 kWh/kW

Step 3: System size

10 ÷ 4.4 = 2.27 kW

Step 4: Panel count

(2.27 × 1000) ÷ 540 = 4.2 → 5 panels

Step 5: Subsidy

₹30,000 × 2 + ₹18,000 × 0.27 ≈ ₹64,909

Result: You need 5 panels (2.7 kW installed). PM Surya Ghar subsidy is approximately ₹64,909, reducing net cost to about ₹59,941. The system generates about 11.88 kWh/day.

❓ Frequently Asked Questions

Q: How much subsidy do I get under PM Surya Ghar?

A: ₹30,000 for 1 kW, ₹60,000 for 2 kW, and ₹78,000 for 3 kW or larger. Above 3 kW, the subsidy stays capped at ₹78,000 [citation:2][citation:12].

Q: How many solar panels do I need?

A: Divide monthly units by 30, then by (peak sun hours × 0.80). Multiply by 1000 and divide by panel wattage, then round up. The calculator does this automatically.

Q: Which Indian city has the best solar potential?

A: Jodhpur/Bikaner (Rajasthan) leads with ~6.5 peak sun hours/day, followed by Ahmedabad (~6.2) and Bhopal (~5.8). Guwahati has the lowest at ~4.5 [citation:4].

Q: What derate factor should I use?

A: 0.80 is standard for India, covering heat derating, dust soiling, inverter, and wiring losses. You can adjust it if you have specific site conditions.

Q: How long does PM Surya Ghar subsidy take?

A: Typically 30–45 days after net meter commissioning and bank detail submission. Gujarat is fastest at 20–28 days; Karnataka 30–40 days [citation:12].